- PILBARA
RAILWAYS
- Set out during
earthworks construction.
- Set out for
track laying
- CBH
SILOS (GERALDTON & MIDWEST)
- Set out during
construction.
- As-con surveys
- DAMPIER -
BUNBURY NATURAL GAS PIPELINE
- Sections of
Route Survey
- Set out during
construction.
- HARRIET OIL
PRODUCTION PLATFORM
- Dimensional
control during construction in Geraldton.
- Dimensional
control during offshore assembly N.E. of Barrow Island.
- ILUKA MINERAL
SANDS
- Principal Surveyors
during construction and upgrade programs of Processing Plant Developments
in Geraldton and Eneabba.
- Stockpile Volume
Surveys.
- NORTH RANKIN
A GAS PLATFORM
- Dimensional
Control on Anchor Systems for Flair structure Geraldton.
- Dimensional
control during offshore installation of Emergency Shut Down Valve.
- MAIN ROADS
- Various new
alignment and upgrade projects on
- Great Northern
Highway
- Newman
- Hedland Road
- Geraldton
- Mt Magnet Road
- Brand Highway
- Alignment and
upgrade of North West Coastal Highway
- Geraldton
to Drummonds Cove
- Construction
Surveys on numerous roads in Midwest.
- Investigation
Surveys for Design Purposes
- NWCH Upgrade
- Great Northern
Highway
- Brand Highway
- White Line
Spotting & Barrier Marking
- Tenement Contract
Surveys.
- Control surveys
throughout the Murchison Goldfields.
- MINERAL EXPLORATION
- Gridding, Tenement
Pegging, Drill Hole Coordination, Preliminary Mine Plan Survey,
Open Pit Volume Surveys, Petroleum Drill Hole Fixing predominantly
using GPS equipment.
- SUBDIVISIONS
- Metropolitan
and Rural Subdivisions from Kalbarri to Greenhead and Meekatharra.
Involved with initial design of subdivisions, the setting out of
internal roads, sewers and drainage to final pegging and early lodgement
of Survey Plans to enable the preparation of titles.
- WINDFARMS
& POWER TRANSMISSION LINES
- Various Route
Surveys and Tower Marking on Lines in the Midwest and Wheatbelt.
- Setout of the
54 Alinta (Walkaway) and the 48 Emu Downs (Cervantes) Wind Turbines
|
|